What did that job really pay you?

Free job return calculator for Australian sole tradies. No signup, nothing saved.

One job, start to finish

Use a finished job or one you're quoting. Only the price and hours are needed.

Job price
Costs
Every hour you put in

Total hours: 0

Optional

๐Ÿ”’ Your numbers stay on your device. None of it is saved or sent. See our Privacy Policy.

Enter the job price and your hours to see what the job really paid you.

Your real hourly rate
$0/hr

Profit on the jobBefore tax and before paying yourself$0
GST to set asideGST on your price minus GST credits on your costs. Check with your accountant or BAS agent.$0

An estimate based on what you entered. A guide only, not tax or financial advice. Figures rounded to the nearest dollar.

Want this number on every job without the maths? Trackexa tracks the after-job number automatically from your quotes, job costs and hours. Sole trader, one login.
Track this automatically on every job
See how Trackexa works out profit per hour โ†’

Try the Smoko Challenge: which job returned the most per hour?

How it works

The after-job number, in plain words

Take what you charged, ex GST. Take off your materials and other job costs, ex GST. Divide what's left by every hour the job took.

(Price ex GST โˆ’ materials ex GST โˆ’ other costs ex GST) รท all your hours = your real hourly rate

If you're registered for GST, the GST on your price goes to the ATO and you claim back the GST on your costs, so the calculator takes both out. If you're not registered, it uses what you actually charged and paid.

"Profit on the job" here is before income tax and before you pay yourself. It's what the job left you to cover your wage, super, insurance, vehicle and everything else.

From Joel's own jobs

A 4-bedroom interior repaint

Joel Walters, the Cairns painter who built Trackexa, ran his own jobs through this same sum. Trackexa showed him a 4-bedroom interior repaint was returning around $65 an hour after paint and materials, while his other work was around $100 an hour.

Both felt like good jobs while he was doing them. Only the after-job number showed the gap, and that changed how he priced those jobs.

Try it with one of your own jobs โ†’

Count everything

The hours people forget

On-site time is the easy part. These are the hours that quietly drag your rate down:

If the job needed it, it belongs in the hours.

What's a good number?

Compare it with your own target rate, not someone else's. Your hourly profit has to cover your wage, super, tax, insurance, vehicle, tools and the quiet weeks. Work out what you need across a year, divide by the hours you can realistically work, and put that in the target box above.

For your trade

Using it for your trade

Painters

Put paint and sundries (tape, filler, rollers, drop sheets) in materials. Count prep honestly, because patching and sanding are where repaints blow out. Second coats and cutting in go in on-site hours, and a return visit for touch-ups goes in too.

Electricians

Add cable, fittings and any parts you bought for the job. Count the wholesaler run and the time writing up the certificate.

Plumbers

Include fittings, fixtures and tip fees. Count the trips back for parts and the time waiting on other trades.

Tilers

Include adhesive, grout, waterproofing and trims. Count curing waits that force an extra trip, plus the time sealing.

FAQ

Questions tradies ask

How do I work out my real hourly rate on a job?

Take the job price ex GST, subtract materials and other job costs ex GST, then divide what's left by every hour the job took. That means on-site time plus travel, quoting, buying materials and admin. The answer is your real hourly rate, the after-job number. It is often lower than the rate you had in your head when you quoted.

Should I include travel and quoting time?

Yes. If the job needed it, it counts. Driving to site, the site visit, writing the quote, picking up materials, invoicing and chasing payment are all hours you gave that job. Leaving them out makes the job look better than it was, and it hides which jobs are quietly eating your week.

Do I use prices including or excluding GST?

Work in ex GST if you're registered. The GST on your price belongs to the ATO, and you claim back the GST on your costs, so neither is your money. This calculator splits it out for you. If you're not registered for GST, use the amounts you actually charged and paid.

How do painters know if a job was profitable?

Track paint and sundries, then count every hour, including prep, second coats, travel and touch-up visits. Divide what's left by those hours. Joel, who built Trackexa, found a 4-bedroom interior repaint was returning around $65 an hour after paint and materials, while his other work was around $100 an hour. That changed how he priced those jobs.

How much profit should a tradie make per hour?

Start from your own target, not someone else's. Your hourly profit has to cover your own wage, super, tax, insurance, your vehicle, tools and the quiet weeks with no work. Work out what you need over a year, divide by the hours you can realistically work, and compare every finished job against that number.

Why did a big job pay less per hour than a small one?

Big jobs often carry more hidden hours: extra prep, waiting on other trades, variations, more trips for materials and more admin. The invoice looks great, but once you divide by every hour it can come out lower than a quick, tidy job. That's why the per-hour number matters more than the size of the invoice.

Is anything I type saved?

No. The calculator runs entirely in your browser. Your numbers aren't saved, sent, logged or attached to analytics, and nothing you type is stored on your device. Close or refresh the page and they're gone. You don't need an account or an email address to use it.